How to achieve cable cars to build cable transportation installation?

There are many types of ropeway transportation installation. We should be more common in many places such as cable cars, mining ropeway transportation installation! So how does the ropeway transportation like our scenic area achieve cable car construction?

1. Research design

Each ropeway cable car is customized. The company that undertakes the ropeway construction will conduct detailed terrain surveys and select the corresponding ropeway system to design the construction plan that meets the requirements of the capital.

2. The foundation of the construction platform is simply digging, digging large holes, and fried when necessary, and then build a concrete platform in the cave. Whether it is the tower in the middle of the ropeway or the terminal at both ends, the solid concrete foundation is required. The size of the platform is mainly determined by the height of the terrain and the tower. The difficulty of this step is to transport concrete for pouring. For better terrain, the construction team can open up a soil road or build a ride. Under bad terrain, helicopter needs to be transported.

3, assembly tower

Install the tower to carry steel cables on the concrete platform. The parts of this tower are usually produced by the construction company at the headquarters and are assembled on the spot by international freight to the ropeway construction location. The assembled tower parts will be transported to the location of the concrete platform by the helicopter, and use bolts to connect through the workers on the ground.

4. Cable rope

The process of building a cable is quite complicated. First of all, the terminal at both ends of the ropeway will approach as much as possible (yes, the terminal of the ropeway can be moved). This process is called DE-TENSION to ensure that the cable is not carried by the rope (the cable is finished, everything is ready, everything is ready In the future, the terminal will be moved back to the normal position, so as to pull the cable straight).

5. Overall debugging

Remember the roller wheels that are preliminary when assembling the tower? It's time to let them completely align. This fine work usually lasts one week to two weeks. After the debugging is over, the ropeway can be loaded. Installation of the carriage is also a complex process. Different cable cars will have different types of delay cable structures.


about product case honorary news contact

Taian ruiteng ropeway engineering technology co., LTD

Service hotline:

BUSINESS COOPERATION:

186-2840-9016

company address

Taian hi-tech zone north tianmen street, number 2907

copyright © Taian ruiteng ropeway engineering technology co., LTD  Lu ICP No. 2022024020 -1